Ground Break

Dream House : Episode DRH-902 -- More Projects »
Tanya and Richard explore the possibility of cutting costs by going through a kit-home builder. Douglas Rixey becomes concerned that the months spent coming to a design decision will have been wasted. With the arrival of the baby, the time Tanya had used to help Richard make design decisions has all but disappeared.

After deciding to stay with the original custom home design, Richard searches for ways to bring the projected costs down. To do that Richard decides to build the house entirely out of concrete. Douglas Rixey rushes to update the plans so that the building permits can be delivered for the scheduled groundbreaking.

With the arrival of the building permit construction can finally begin. But, when Richard inspects the proposed placement of the house, he is dismayed to discover that it is not in the right place! Now he must scramble to make the corrections, as the crew stands ready for action.

The excavation begins. Richard and Tanya nervously look on as their empty plot of land becomes a busy construction site.

Resources
Kohler Power Systems
Kohler Power Systems
444 Highland Drive
Kohler WI 53044
Toll-Free Phone: 800-544-2444
Website: www.kohlerpower.com

Marvin Windows and Doors
Marvin Windows and Doors
Website: www.marvin.com

First Savings Mortgage
Charlotte Worrell, Project Manager
Phone: 703-827-4629
E-mail: cworrell@fsavings.com

Weyerhaeuser Company
Weyerhaeuser Company
Website: www.weyerhaeuser.com
Guests
Douglas Rixey, AIA
Rixey-Rixey Architects
P.O. Box 3750
Washington, DC 20007
Phone: 202-333-2626

John Witmer
Witmer Associates, LLC
234 Hungerford Drive
Rockville, MD 20850
Phone: 301-309-8600
E-mail: witmer@wans.net
Also in this Episode