Dream House

Timber Frame Assembly, Dormer Window Installation and Septic System Problems at the Construction Site

Episode DRH-1903

See all Episodes

Tune In

  • September 01, 2011

    7:00 AM e/p

The massive beams for the Mackey's timber frame home finally arrive, but assembly is threatened by the rainy weather. When the framing is finally finished, the Mackey's mark the occasion with special touches, including a hand carved beam with the vineyard's name, Notaviva. The dormers are next to be installed, and the budget takes another hit when problems develop with the septic tank and force the Mackey's to make some tough decisions.