Dream House

Construction Commotion

Episode DRH-1204

See all Episodes

As the walls rise, the homeowners Anita and Brad Feder become concerned about discrepancies between the drawings and how things actually look. Brad is spending more and more time at the site, which is causing some friction with the builder. Changes in one end of the house result in structural complications.

A desert rainstorm causes an evacuation and there are doubts about the location of the master bedroom and the fireplace. A meeting with interior designer Lori Carroll is called to resolve a problem with floor tiles. Stonemasons and steel crews work simultaneously. The amount of steel being used impacts the schedule and budget. Brad questions equipment rental costs.

Construction moves forward on the custom hillside swimming pool and oversized spa. Stonemasons mark their ninth month on the job. A change order requested by the Feders for the fireplace in the master bedroom has led to some structural issues.

Resources

    • construction management—Gene Goldstein Construction Management, Inc.
      Gene Goldstein
      5615 East River Road, Suite 101
      Tucson, AZ 85750
      Phone: 520-529-6060
      E-mail: idra4u@aol.com
    • steel fabrication—Bovell Builders
      3226 East District St.
      Tucson, AZ 85714
      Phone: 520-749-2539
    • building architect—Kevin B. Howard Architects
      4547 E. Fort Lowell , Suite 421
      Tucson, AZ 85712
      Phone: 520-322-6800
      Website: www.kbharchitect.com
    • designer—Lori Carroll & Associates, LLC
      Lori Carroll, ASID, IIDA
      1200 N. El Dorado Place, Suite B-200
      Tucson, AZ 85715
      Phone: 520-886-3443
      Website: www.loricarroll.com