Dueling Kitchens from Design Star Challenge 2

For the second Design Star challenge, the designers had to remodel a kitchen. They were separated into two teams, each having 28 work hours and a budget of $10,000 to complete the project.

Tools
Font
  • A
  • A
  • A

E-mail This Page to Your Friends

x

All fields are required.

Separate multiple e-mail addresses with a comma; Maximum 20 email addresses.

Refresh

Sending E-mail

Sending E-mail

Or Do Not E-mail

Success!

A link to %this page% was e-mailed

All About

The replacement of the existing black appliances with new black appliances is problematic for this team. Previously, the black appliances blended more effectively with the dark-wood cabinets. Now, however, the new appliances contrast sharply with the new light cabinets and your eye is drawn to them instantly. White appliances — or preferably stainless — would have contrasted less and allowed the eye to rest on some of the more positive aspects of the room.
Advertisement